PLC and SCADA Upgrading

PLC and SCADA Upgrading Project: PLC and SCADA Upgrading for Haditha Diesel Power Station Location: Haditha, Al-Anbar, Iraq Starting date: June 13, 2022 Contractor: Al BINAA Al MOUASER Duration: 27 Months Completion: 80% The control works in the project primarily focused on a comprehensive upgrade of the control systems at the plant. This includes the … Read more

Haditha Diesel Power Station (230MW)

Haditha Diesel Power Station (230MW) Project: Rehabilitation and Maintenance for Haditha Diesel Power Station (230MW) Location: Haditha, Al-Anbar, Iraq Starting date: May 18, 2022 Contractor: Al BINAA Al MOUASER Duration: 27 Months Completion: 80% Major overhaul for Haditha Diesel Power Station 23MW X 10 gensets, including turbochargers rehabilitation, crankshafts replacement, and redesign of connecting rods … Read more

New headquarter

about us

New headquarter Project: The headquarter of Al-Binaa Al-Mouaser General Contracting Ltd. Location: 14 Ramadan Street, Al-Mansour Starting date: Jan. 15, 2021 Contractor: Al BINAA Al MOUASER Duration: 12 Months Completion: 100% Our company is implementing a building consisting of four (4) floors to be the company’s main headquarters, with a construction area of 1200 square … Read more

Extension of Burj Al Zubair Phase II – Completed

Extension of Burj Al Zubair Phase II – Completed We have completed the Construction Burj Al Zubair Phase II project. The project includes new external VIP new reception room, new VIP car parking with sheds, RO system, VIP external elevator, and furnished two floors. 

Project Burj Al Zubair

Project Burj Al Zubair Construction of Burj Al Zubair seven (7) story building in Al-Basrah A seven-story building, approximate area of 15000 m2. The building is equipped with many high electrical, mechanical, and control systems such as the cooling system – VRF, intelligent fire alarm system, developed ICT system, R.O plant, firefighting sprinklers system in … Read more

Burj Al Zubair – VIP Floor

Burj Al Zubair – VIP Floor Client: Ministry of Oil (South Oil Company) and Eni Iraq B VContractor: Al BINAA Al MOUASER in Al Zubar Oil Field.Location: Basrah-IraqDuration: 8 Months and 23 DaysAmount: 2,100,000 USDProject delivered on 11/May/2020 Percent of implementing project: 100% Burj Al Zubair Phase II project. The project includes new external VIP … Read more

Zubair Towers Complex

Zubair Towers Complex Turnkey Project Client: Ministry of Oil (South Oil Company) and Eni Iraq B VContractor: Al BINAA Al MOUASER in Al Zubar Oil Field.Duration: 33.5 MonthsAmount: 23,750,000 USDPercent of implementing project: 100% A seven-storey building of approximate area of 15000 m2 of offices, meeting rooms, etc. The building is equipped with many hight … Read more

The IRAQIA University

The IRAQIA University Supply and Implementation of the Main Water, firefighting, Sewage and Irrigation networks. This project consists of supply and constructs water and sewage networks for the Iraqia University buildings that are built on 50,000m2 area and consist of: The supply and construct water supply system ( including feeding lines pipes from the source … Read more

The IRAQIA University / Central Cooling System

The IRAQIA University / Central Cooling System Comprehensive works for Mechanical and Cooling Systems.  1- Supply, installation and operation of five water cooled chillers( type DAIKIN ) origin japan and of total cooling capacity of 2700 Ton ( 32,400,000 Btu) plus erection of required building and chilled and return water networks( carbon steel pipes with … Read more

Rehabilitation and maintenance of Al-Rutba station

Rehabilitation and maintenance of Al-Rutba station Client: The Ministry of ElectricityContractor: Al BINAA AL MOUASER Implementation date: 2019-2020Percent of implementing project: 100% Al BINAA AL MOUASER  for General Contracting co Ltd. has rehabilitated the Rutbah diesel station by carrying out inspection, equipping and installing some necessary parts for the station in  addition to rehabilitating two diesel … Read more