Construction of Burj Al Zubair seven (7) story building in Al-Basrah
A seven-story building, approximate area of 15000 m2. The building is equipped with many high electrical, mechanical, and control systems such as the cooling system – VRF, intelligent fire alarm system, developed ICT system, R.O plant, firefighting sprinklers system in addition to electrical substation and all required external landscape and buildings, Car-Park and roads
Client: Ministry of Oil (South Oil Company) and Eni Iraq BV
Contractor: Al BINAA Al MOUASER in Al Zubar Oil Field.